A
-
AHP
Weighing and Prioritizing of Factors Influencing on Employee Productivity in Construction Industry by Methods of Decision Making of Multi-Criteria Electricians [Volume 2, Issue 3, 2017, Pages 4-8]
-
ANN
Application of ANN in Prediction of Vibration Caused By Blast Operation, Case Study Shur River Dam [Volume 2, Issue 2, 2017, Pages 27-31]
-
Architectural Considerations
Architectural Design of Clean Rooms in Pharmaceutical Industry [Volume 2, Issue 1, 2017, Pages 17-21]
B
-
Building Information Modeling (BIM)
Evaluating the Effect of BIM in the Design Phase to Reduce Construction Claims [Volume 2, Issue 3, 2017, Pages 9-16]
-
Building Supervision
The study of Difficulties Encountered in Supervision of Construction Projects in the Monitoring System of Iran Using the FMEA and Providing a Solution to Improve it [Volume 2, Issue 2, 2017, Pages 37-42]
C
-
Claims
Evaluating the Effect of BIM in the Design Phase to Reduce Construction Claims [Volume 2, Issue 3, 2017, Pages 9-16]
-
Clean Room
Architectural Design of Clean Rooms in Pharmaceutical Industry [Volume 2, Issue 1, 2017, Pages 17-21]
-
Cold-Formed Steel Structures
Evaluation indexes quality, cost and time at Lightweight steel structures (case study:LSF structures in yazd city) [Volume 2, Issue 1, 2017, Pages 37-42]
-
Construction
Evaluating the Effect of BIM in the Design Phase to Reduce Construction Claims [Volume 2, Issue 3, 2017, Pages 9-16]
-
Construction
Analytical allocation of new construction methods based on future residential demand to modify residential construction efficiency plan [Volume 2, Issue 4, 2017, Pages 1-9]
-
Construction and supervision
Management strategy design, construction and project supervision
The emergency plan for river protection kan [Volume 2, Issue 2, 2017, Pages 20-26]
-
Construction Contractor
The Relationship of Transformational Leadership and Human Resource Efficiency with the Continuity Approach to Corporate Life
(Case study: Eastern Azarbayjan Construction Contractor companies) [Volume 2, Issue 4, 2017, Pages 11-22]
-
Construction Engineering Organization
The study of Difficulties Encountered in Supervision of Construction Projects in the Monitoring System of Iran Using the FMEA and Providing a Solution to Improve it [Volume 2, Issue 2, 2017, Pages 37-42]
-
Construction projects
The study of Difficulties Encountered in Supervision of Construction Projects in the Monitoring System of Iran Using the FMEA and Providing a Solution to Improve it [Volume 2, Issue 2, 2017, Pages 37-42]
-
Consultant
Management strategy design, construction and project supervision
The emergency plan for river protection kan [Volume 2, Issue 2, 2017, Pages 20-26]
-
Continuity of Companies
The Relationship of Transformational Leadership and Human Resource Efficiency with the Continuity Approach to Corporate Life
(Case study: Eastern Azarbayjan Construction Contractor companies) [Volume 2, Issue 4, 2017, Pages 11-22]
-
Contractor companies
Provide a model of the impact of Value Engineering and Organizational Agility in improving the competitiveness of construction industry companies [Volume 2, Issue 4, 2017, Pages 30-42]
D
-
Design Management
Evaluating the Effect of BIM in the Design Phase to Reduce Construction Claims [Volume 2, Issue 3, 2017, Pages 9-16]
-
Design management strategy
Management strategy design, construction and project supervision
The emergency plan for river protection kan [Volume 2, Issue 2, 2017, Pages 20-26]
E
-
Economic efficiency
Knowledge management impact on economic productivity of knowledge-based projects [Volume 2, Issue 1, 2017, Pages 22-31]
-
ElECTERE
Weighing and Prioritizing of Factors Influencing on Employee Productivity in Construction Industry by Methods of Decision Making of Multi-Criteria Electricians [Volume 2, Issue 3, 2017, Pages 4-8]
-
ELECTERE method
Optimal Selection of Steel and Concrete Structures using ELECTERE Method [Volume 2, Issue 2, 2017, Pages 14-19]
-
Emergency protection plan
Management strategy design, construction and project supervision
The emergency plan for river protection kan [Volume 2, Issue 2, 2017, Pages 20-26]
-
Empirical Models
Application of ANN in Prediction of Vibration Caused By Blast Operation, Case Study Shur River Dam [Volume 2, Issue 2, 2017, Pages 27-31]
-
Explosion operation
Application of ANN in Prediction of Vibration Caused By Blast Operation, Case Study Shur River Dam [Volume 2, Issue 2, 2017, Pages 27-31]
F
-
FAHP method
Investigation the effect of job satisfaction factors on safety in civil project [Volume 2, Issue 2, 2017, Pages 32-36]
-
FMEA
The study of Difficulties Encountered in Supervision of Construction Projects in the Monitoring System of Iran Using the FMEA and Providing a Solution to Improve it [Volume 2, Issue 2, 2017, Pages 37-42]
G
-
Genetic Algorithm
Analytical allocation of new construction methods based on future residential demand to modify residential construction efficiency plan [Volume 2, Issue 4, 2017, Pages 1-9]
H
-
Housing
Analytical allocation of new construction methods based on future residential demand to modify residential construction efficiency plan [Volume 2, Issue 4, 2017, Pages 1-9]
-
HSE
Investigation the effect of job satisfaction factors on safety in civil project [Volume 2, Issue 2, 2017, Pages 32-36]
-
Human Resource Efficiency
The Relationship of Transformational Leadership and Human Resource Efficiency with the Continuity Approach to Corporate Life
(Case study: Eastern Azarbayjan Construction Contractor companies) [Volume 2, Issue 4, 2017, Pages 11-22]
J
-
Job Satisfaction
Investigation the effect of job satisfaction factors on safety in civil project [Volume 2, Issue 2, 2017, Pages 32-36]
-
Job Stress
Investigation the effect of job satisfaction factors on safety in civil project [Volume 2, Issue 2, 2017, Pages 32-36]
K
-
Kan River
Management strategy design, construction and project supervision
The emergency plan for river protection kan [Volume 2, Issue 2, 2017, Pages 20-26]
-
Keywords: Competitive ability
Provide a model of the impact of Value Engineering and Organizational Agility in improving the competitiveness of construction industry companies [Volume 2, Issue 4, 2017, Pages 30-42]
-
Keywords: Transformational Leadership
The Relationship of Transformational Leadership and Human Resource Efficiency with the Continuity Approach to Corporate Life
(Case study: Eastern Azarbayjan Construction Contractor companies) [Volume 2, Issue 4, 2017, Pages 11-22]
-
Knowledge Management
Knowledge management impact on economic productivity of knowledge-based projects [Volume 2, Issue 1, 2017, Pages 22-31]
L
-
Lightweight Steel Framing
Evaluation indexes quality, cost and time at Lightweight steel structures (case study:LSF structures in yazd city) [Volume 2, Issue 1, 2017, Pages 37-42]
-
LSF
Evaluation indexes quality, cost and time at Lightweight steel structures (case study:LSF structures in yazd city) [Volume 2, Issue 1, 2017, Pages 37-42]
M
-
Manufacturing Industry
Weighing and Prioritizing of Factors Influencing on Employee Productivity in Construction Industry by Methods of Decision Making of Multi-Criteria Electricians [Volume 2, Issue 3, 2017, Pages 4-8]
N
-
New Methods
Analytical allocation of new construction methods based on future residential demand to modify residential construction efficiency plan [Volume 2, Issue 4, 2017, Pages 1-9]
O
-
Organizational Agility
Provide a model of the impact of Value Engineering and Organizational Agility in improving the competitiveness of construction industry companies [Volume 2, Issue 4, 2017, Pages 30-42]
P
-
Passive Defense
The utilization of a traditional water supply system with construction management in accordance with the passive defense approach
(Case study: Traditional water supply in Yazd province) [Volume 2, Issue 2, 2017, Pages 5-13]
-
Pharmaceutical Facilities
Architectural Design of Clean Rooms in Pharmaceutical Industry [Volume 2, Issue 1, 2017, Pages 17-21]
-
Plan
Analytical allocation of new construction methods based on future residential demand to modify residential construction efficiency plan [Volume 2, Issue 4, 2017, Pages 1-9]
-
Productivity
Weighing and Prioritizing of Factors Influencing on Employee Productivity in Construction Industry by Methods of Decision Making of Multi-Criteria Electricians [Volume 2, Issue 3, 2017, Pages 4-8]
R
-
Risk Management
Investigation and evaluation of construction and commissioning risks in construction projects (Case Study: Hospital) [Volume 2, Issue 3, 2017, Pages 36-45]
S
-
Shur river dam
Application of ANN in Prediction of Vibration Caused By Blast Operation, Case Study Shur River Dam [Volume 2, Issue 2, 2017, Pages 27-31]
-
Slope Stabilization"
Evaluation of methods for the stabilization of rocky slopes and slopes with a time-cost reduction approach (case study: Abali slopes) [Volume 2, Issue 4, 2017, Pages 54-60]
T
-
Traditional water supply
The utilization of a traditional water supply system with construction management in accordance with the passive defense approach
(Case study: Traditional water supply in Yazd province) [Volume 2, Issue 2, 2017, Pages 5-13]
V
-
Value engineering
Provide a model of the impact of Value Engineering and Organizational Agility in improving the competitiveness of construction industry companies [Volume 2, Issue 4, 2017, Pages 30-42]
Your query does not match with any item